The results of analysing a total of 64 factors considered in the questionnaire reveal that the top five factors affecting the accuracy of pre-tender cost estimating are (1) materials (prices/availability/supply/quality/imports), (2) closure and blockade of borders, (3) project team's experience in the construction type, (4) the experience and skill level of the consultant and (5) clear and detailed drawings and specifications. A survey questionnaire was conducted to elicit professionals' views on and experiences with factors affecting the accuracy of pre-tender cost estimates a total of 70 organisations (i.e., 46 clients and 24 consultants operating in the Gaza Strip, Palestine) responded to the survey. The aim of this paper is to identify, evaluate and rank essential factors affecting the accuracy of pre-tender cost estimating from the perspective of clients and consultants. Abstract: Pre-tender cost estimates of construction projects require extensive knowledge and expertise.